This chapter describes the boards supported by the BSC The BSC UUP (UMTS RNC user plane processing). -. -. 2 GE. 2 GE. Home/Groups/Wireless Network Info Community. BSC e BSC RNC in Pool. Armetta Diamond (1) 4 years 6 months ago View: Reply: 0. Comment. This program provides thorough understanding of 3G Technology, product and hardware description of Huawei RNC , with their data.

Author: Doukree Yozshutaur
Country: Bosnia & Herzegovina
Language: English (Spanish)
Genre: Technology
Published (Last): 5 July 2014
Pages: 465
PDF File Size: 19.30 Mb
ePub File Size: 6.88 Mb
ISBN: 356-8-74982-769-1
Downloads: 90735
Price: Free* [*Free Regsitration Required]
Uploader: Dousida

Requirements for Equipment Status Before commissioning, ensure that the equipment meets the conditions listed in Table Format Description Key Press the key. The A interface verification varies according to the transmission mode of the A interface.

The following takes one base station as an example to describe the commissioning process on the Abis interface. Italic Command arguments are in italics. Press Enter to change the reg.

Bsc6900 UMTS/GSM Bsc Rnc 6900 Rnc6900

The information 69000 this document is subject to change without notice. Context During the interface verification, you can run the LST command to view the configuration information.

  HONEYWELL FG-1625 PDF

Compared with issue 05this issue excludes the following topics: Check whether any board related fault alarm is guawei in the Alarm tab page. Italic Book titles are in italics.

Download Latest Huawei BSC RNC Documentation

Requirements for Commissioning the Network To ensure smooth verification of the Abis, Ater, A, and Gb interfaces, the network equipment in the commissioning network must meet the following requirements: Table lists communication ports used by the services of the BSC If either of the following cases occurs, see If the value of the Port running state is Port is down, see the Click here to sign up. Check the connectivity of the gateway mandatory in three-layer networking.

If the value of Port running state is Port is down, handle the problem as follows: The actual link status of the ports on the SCUa boards are displayed in the returned result. The Abis interface verification varies according to the transmission mode over the Abis interface.

The Compare consistent message is displayed.

BSC Boards and its funtion-Core Network Info Community-Huawei Connect

Double-click the newly-added NE on the left pane. The All table data consistent. The default user name and password for FTP login are both admin. Step 8 Change the external fixed IP address, subnet mask, and the gateway IP address according to the plan of the operator. Check that all information is correct.

  HUNGER OF THE WOLF MADELAINE MONTAGUE PDF

Step 2 Power on the cabinet by referring to Powering On the Cabinet. The connection is improper, Correct the connection, and then reload the data to the board.

It includes the following contents: The version of the OMU application is the Perform operations in Step 7 through Step same as that required huaweei the operator, For details, see Preparations for Installing Software on Site.

Solutions When the user plane is over IP transmission, handle the failure according to Table NOTE Two methods are available: The information returned is unused, Go to Step 6.

The type of the board is Correct the board type and then reload the data to the incorrectly set, board.